Today saw the completion of the CAD drawing for the funnels and their bases, whilst these are basic structures all of the additional fittings will be added when these have been printed. The fitting will include the four revolving vents per block, brass etch ladder sets to access the joining deck sections that go between each funnel block, the exhaust steam pipes and a number of hatches between them.
I will start printing the blocks and hope to have some photos of these in a day or so, but for now its time to fix the brass etch watertight doors and hatches to the hull.